LogDrop
PanelCustomer Journeys

Create a Journey

Create a journey, configure its settings, and arrange its flow on the canvas

Select a screenshot to open it at full size.

1) Open the journey builder

The journey builder is the editor where you set up a journey and arrange its flow on a canvas. You can start with an empty flow or from an existing funnel.

  1. Select your project in LogDrop Panel.
  2. Open Engagement → Customer Journeys.
  3. Click New Journey.
  4. Under Start journey from, choose Start from scratch or an existing funnel.

New journey editor with the Start journey from menu open

Start from scratch

A new journey starts with three connected nodes: an Entry event, a Mobile push and an Exit set to Journey completed. Configure the Entry event and the push, add the steps you need, and connect every path. Remove the Mobile push if your flow does not need one, and add another Exit for routes that should end as Journey exited.

Start from an existing funnel

An existing funnel can provide a starting structure. Use it when you have already defined the steps you want to follow as a funnel. Its first event becomes the Entry event; later events become Wait for event steps. Review the imported filters, timeout values, and connections, then configure the notification content.

Importing a funnel creates a journey you can edit. Do not assume that later edits to the funnel will automatically update this journey.

2) Set the name and description

The name identifies the journey in the panel. Use the description to record what the journey is for.

  • Journey name: Use a clear name, such as Product Follow-Up. Names must be unique within the project and contain 2–120 characters.
  • Description: Optionally explain the goal or intended audience. The limit is 500 characters.

3) Set the maximum duration

Maximum duration (days) is the time a user's run is allowed to remain in the journey. The panel accepts 1–60 days. A run that exceeds this duration exits without completing the flow.

This must cover the longest configured waiting path. Include both fixed Wait durations and Wait for event timeouts on that path. For branching flows, check the longest route, including SMS's Skipped route when it contains additional waiting steps.

For example, a 12-hour event timeout followed by a 2-hour Wait needs at least 14 hours. A maximum duration of 1 day covers that configured path; use additional margin when appropriate for your workflow.

Journey name, description, duration, and re-entry settings

4) Set the re-entry delay

Re-entry delay (days) determines how soon a user can start another run after their previous run finishes. Use it to control how often the same user can go through the journey, for example so that a user does not get the same reminder too often.

ValueBehavior
0A later matching entry event can start a new run after the previous run finishes.
1Wait one day after the previous run finishes before allowing re-entry.
Another value up to 60Use the configured delay to space out repeated runs.

Re-entry does not create a second simultaneous run for a user who is already in the same journey. It also does not start a run by itself: another matching Entry event is still required.

5) Add and configure steps

Each step in a journey is a node. Use the Add step controls beside the canvas. Click a node to open Node settings. Each node type has its own required configuration.

NodeUse it to
Entry eventDefine what starts the journey. There is exactly one per flow.
WaitPause for a fixed duration.
Wait for eventWait for a new event, with event paths and a timeout path.
ConditionImmediately choose True or False using existing event or device data.
WhatsApp MessageSend a Meta-approved text template using a connected WhatsApp Business account.
SMS MessageRequest an SMS using a connected Twilio account.
Mobile pushConfigure a mobile notification, in-app message, or deep link.
ExitEnd the run as completed or exited.

WhatsApp steps require a project connection, an approved template, recipient and consent attributes, and WhatsApp access in the subscription. See WhatsApp Config and message setup.

6) Connect the flow

Connections decide which step a user moves to next. A node can have several outputs, one for each possible outcome. Drag from an output handle at the bottom of a node to the input handle at the top of the next node. Output labels explain which outcome follows that connection.

  • Next: Continue after a step.
  • True / False: The result of a Condition.
  • Event path / Timeout: The result of waiting for an event.
  • Continue / Skipped: The result of SMS eligibility checks.

Multiple paths may lead into the same node. For example, both SMS outputs can lead to a Mobile push step. Loops are not supported. All nodes must be reachable from the Entry event, and the flow must contain an Exit.

To remove a connection, click its line and use the delete button that appears. Then connect the output to its intended destination. Removing a node also removes its connections, so check surrounding paths afterward.

Connected outputs on the journey canvas

7) Select and move nodes

Use these controls to keep a large journey readable and to move several nodes at once. The controls at the top right of the canvas offer two modes:

Mode / shortcutAction
SelectDrag on empty space to draw a selection box.
Shift + clickAdd a node to the selection, or remove it from the selection.
Drag a selected nodeMove the selected group together.
MoveDrag with the left mouse button to navigate around the canvas.
Hold SpaceTemporarily move around the canvas.
Canvas zoom controlsZoom in or out and fit the flow into view.
Expand canvasUse more screen space for arranging a large journey.

The selection rectangle appears while you draw it. After you release the mouse, the selected nodes remain highlighted with blue borders.

Multiple selected nodes with Select and Move controls

8) Duplicate a configured node

Use this when several branches need a similar step. Click a node's Duplicate node icon to create another node of the same type. The copy keeps the configuration, including message content, recipient and consent settings, filters, or wait duration. It appears nearby and is selected for editing.

The copy's outgoing connections are empty. Connect it to the appropriate steps before saving. Editing the copy does not change the original node.

Entry event cannot be duplicated. A journey must have only one entry.

SMS node and its independent duplicated copy

9) Save the draft

Check that required settings are filled in and paths are connected, then click Save draft. The panel highlights configuration or connection problems that need attention. A draft must pass the flow checks; saving is not a way to keep disconnected or unconfigured steps.

A new draft is inactive until you publish it. Saving an edit to an active journey changes its status to Paused and does not publish the edits. See Publish and monitor before updating an already published flow.

On this page